DKR update 8/02/08

blym

250+ Posts
newdkr104.jpg


newdkr105.jpg


newdkr106.jpg


newdkr107.jpg


newdkr108.jpg


newdkr109.jpg


newdkr110.jpg


newdkr111.jpg


newdkr112.jpg


newdkr113.jpg


newdkr114.jpg


newdkr115.jpg
 
Laying brick is not that time consuming. They must have had a supply problem with the white stone, or the bricks themselves. No other excuse for having the scaffolding still in the way.

thanks foe the pictures, btw!
 
What's that scaffolding stuff in the 2nd to last photo? Are they doing some minor construction around there?
 
newdkr116.jpg
[/IMG]

I did not add this picture before because the 8/1 update showed it. Looks like they are adding a new egress stair from the end of the lower level west deck or possibly the suites or concourse to connect to the concrete ramps.
 
Hope this can wipe away the bad memories of the old NEZ (stone drunk frat boys singing loundly and hitting people with umbrella and blue hairs asking us to sit down for the whole game).
 

Weekly Prediction Contest

Predict TEXAS-ARIZONA STATE

CFP Round 2 • Peach Bowl
Wed, Jan 1 • 12:00 PM on ESPN
AZ State game and preview thread


Chick-fil-A Peach Bowl website

Recent Threads

Back
Top